Use of Offsite Manufacturing Methods (OSM) in Muscat Oman
Questionnaire Survey by G.S.Gnanarathna/1100626
Kindly, request to answer the questionnaire precisely, according to your experience in Muscat, for using OSM or not using them with valid reasons which this survey is looking for. Your answers will decide the outcome of survey.
Offsite Manufacturing method for constructions can be defined as work or part of work which could have been completed at site itself, is done offsite (ex: in a factory), transported and installed at site. These methods can be classified into two groups as; 1.) Volumetric methods (ex: complete office or bathroom or kitchen is assembled in a factory, transport and installed at site) 2.) Non-volumetric methods (ex:foundations, beams, columns, slabs,walls,roof etc are pre-cast or pre-fabricated outside, transport and installed at site).
1.0 About Yourself
Please select appropriate answers
Name
First Name
Last Name
1.1 Are you employed for
Government
Consultant
Contractor
Property developer
Other
1.2 Current position
Advisor
Manager
Enginer
Architect
Quantity surveyor
Planner
Other
1.3 Educational Background
MSc, MBA
BSc
HND, HNDE
Diploma
Other
1.4 Overall Experiance
1 - 5 years
6 - 10 years
11 - 15 years
16 - 20 years
More than 20 years
1.5 Experiance in Muscat
1 - 5 years
6 - 10 years
11 - 15 years
16 - 20 years
More than 20 years
2.0 Rate the use of following OSM methods in Muscat
Please answer these questions as per your experience in Muscat for respective elements of OSM
2.1 Pre-cast concrete piling
0 - never
1 - rarely
2 - moderately
3 - mostly
2.2 Pre-cast concrete foundations
0 - never
1 - rarely
2 - moderately
3 - mostly
2.3 Pre-cast concrete ground beams
0 - never
1 - rarely
2 - moderately
3 - mostly
2.4 Pre-cast concrete beams and columns
0 - never
1 - rearly
2 - moderately
3 - mostly
2.5 Pre-cast concrete slabs
0 - never
1 - rarely
2 - moderately
3 - mostly
2.6 Pre-fabricated steel structures
0 - never
1 - rarely
2 - moderately
3 - mostly
2.7 Pre-fabricated timber frames
0 - never
1 - rarely
2 - moderately
3 - mostly
2.8 Pre-cast concrete wall panels
0 - never
1 - rarely
2 - moderately
3 - mostly
2.9 Pre-fabricated wall panels other than concrete
0 - never
1 - rarely
2 - moderately
3 - mostly
2.10 Pre-fabricated roof systems
0 - never
1 - rarely
2 - moderately
3 - mostly
2.11 Kitchen and bathroom pods
0 - never
1 - rarely
2 - moderately
3 - mostly
2.12 Pre-assembled mechanical or electrical services (ex:ducts are fabricated offsite)
0 - never
1 - rarely
2 - moderately
3 - mostly
2.13 Pre-assembled mechanical or electrical plants
0 - never
1 - rarely
2 - moderately
3 - mostly
2.14 Re-locatable volumetric units (ex: temporaray site offices)
0 - never
1 - rarely
2 - moderately
3 - mostly
2.15 Permanent volumetric units
0 - never
1 - rarely
2 - moderately
3 - mostly
3.0 Rate the availability or non-availability of competitive suppliers for following OSM methods in Muscat
3.1 Pre-cast concrete piling
0 - not available
1 - hardly
2 - few
3 - many
3.2 Pre-cast concrete foundations
0 - not available
1 - hardly
2 - few
3 - many
3.3 Pre-cast concrete ground beams
0 - not available
1 - hardly
2 - few
3 - many
3.4 Pre-cast concrete beams and columns
0 - not available
1 - hardly
2 - few
3 - many
3.5 Pre-cast concrete slabs
0 - not available
1 - hardly
2 - few
3 - many
3.6 Pre-fabricated metal structures
0 - not available
1 - hardly
2 - few
3 - many
3.7 Pre-fabricated timber frames
0 - not available
1 - hardly
2 - few
3 - many
3.8 Pre-cast concrete wall panels
0 - not available
1 - hardly
2 - few
3 - many
3.9 Pre-fabricated wall panels other than concrete
0 - not available
1 - hardly
2 - few
3 - many
3.10 Pre-fabricated roofs
0 - not available
1 - hardly
2 - few
3 - many
3.11 Kitchen and bathroom pods
0 - not available
1 - hardly
2 - few
3 - many
3.12 Pre-assembled mechanical or electrical services
0 - not available
1 - hardly
2 - few
3 - many
3.13 Pre-assembled mechanical or electrical plants
0 - not available
1 - hardly
2 - few
3 - many
3.14 Re-locatable volumetric units
0 - not available
1 - hardly
2 - few
3 - many
Click to edit
3.15 Permanent volumetric units
0 - not available
1 - hardly
2 - few
3 - many
4.0 Rate the use of OSM methods for following building sectors in Muscat
4.1 Mixed use commercial developments (Ex: shopping malls/office with apartments)
0 - No
1 - rarely
2 - moderately
3 - mostly
4.2 Tourism developments (Ex:Hotels, townhouses etc)
0 - No
1 - rarely
2 - moderately
3 - mostly
4.3 Accommodation buildings (Ex: Hostels, labourcamps etc)
0 - No
1 - rarely
2 - moderately
3 - mostly
4.4 Schools
0 - No
1 - rarely
2 - moderately
3 - mostly
4.5 Government offices
0 - No
1 - rarely
2 - moderately
3 - mostly
4.6 Residential apartment buildings
0 - No
1 - rarely
2 - moderately
3 - mostly
4.7 Villas and Housing schemes
0 - No
1 - rarely
2 - moderately
3 - mostly
5.0 Effects of OSM methods
Please answer following questions as per your experiance by considering market conditions in Muscat Oman (availability of designers, sub-contractors, suppliers, transportation costs etc.).
Do you think that OSM methods will generally
5.1 reduce overall time duration
0 - 10%
11 - 20%
21 - 30%
31 - 40%
No saving
5.2 reduce overall cost
0 - 10%
11 - 20%
21 - 30%
31 - 40%
No saving
5.3 increase the quality
Yes
No
Uncirtain
5.4 reduce material waste
Yes
No
Uncirtain
5.5 reduce HSE issues at site
Yes
No
Uncirtain
5.6 reduce lifecycle costs
Yes
No
Uncirtain
5.7 increase the sustainability
Yes
No
Uncirtain
6.0 Identify the barriers to OSM methods
If competitive suppliers for non-volumetric methods are sufficiently not available in Oman
6.1 do you think still there is a time saving
Yes
No
Uncirtain
6.2 do you think still there is a cost saving
Yes
No
Uncirtain
If competitive suppliers for volumetric methods are sufficiently not available in Oman
6.3 do you think still there is a time saving
Yes
No
Uncirtain
6.4 do you think still there is a cost saving
Yes
No
Uncirtain
What is your evaluation for following statements
6.5 There is a reluctant for changes and innovations by Clients which hinder the introduction of OSM methods
0 - No
1 - rarely
2 - moderately
4 - mostly
6.6 There is a barrier for introduction of OSM methods due to legislative restrictions such as maximum use of Omani materials, local agents, 30% omanisation etc
0 - No
1 - rarely
2 - moderately
4 - mostly
6.7 Employers are educated about OSM methods
0 - No
1 - rarely
2 - moderately
4 - mostly
OSM methods are fast track constructions which require proper cordination, competent planners, well educated staff, high skill labours, heavy equipments, much accurate installations etc
6.8 There are competent contractors who can incorporate OSM methods
0 - No
1 - rarely
2 - moderately
4 - mostly
6.9 Traditional procurement methods which is commenly used for building construction projects in Muscat is a barrier for introduction of OSM
0 - No
1 - rarely
2 - moderately
4 - mostly
6.10 Designers convince Clients about advantages of using OSM methods and try to incorporate them
0 - No
1 - rarely
2 - moderately
4 - mostly
6.11 OSM methods are incorporated where there is a minimum cordination risks (ex:parking structures)
0 - No
1 - rarely
2 - moderately
4 - mostly
Designers are in a difficulty for introduction of OSM methods for buildings other than parking structures due to inherent difficulties in OSM methods such as
6.12 Design needs to be finalised exactly at the beggining including all services, penetrations, fixing details etc.
0 - No
1 - rarely
2 - moderately
4 - mostly
6.13 coordination errors will create difficulties at erection statge at site.
0 - No
1 - rarely
2 - moderately
4 - mostly
6.14 last moment changes are much difficult.
0 - No
1 - rarely
2 - moderately
4 - mostly
6.15 Designers in a difficulty to introduction of OSM methods as there is no overall cost saving
0 - No
1 - rarely
2 - moderately
4 - mostly
6.16 Lack of using modern technology such as Building Information Modeling (BIM) for building projects is a barrier for introduction of OSM methods
0 - No
1 - rarely
2 - moderately
4 - mostly
6.17 Please state any other barriers for introduction of OSM methods